TECHNOLUX Equipment & Supply Corp. Highlights

TECHNOLUX BY DESIGN CONSULTANCY DIVISION

 

TECHNOLUX is the Philippines’ largest importer and distributor that supplies a complete line of Foodservice, Smallwares, Laundry and Cleaning equipment to hotels, resorts, hospitals, manufacturing and industrial plants, restaurants, quick service restaurants, convenience stores and various institutions involved in thefoodservice and hospitality industry.

 

TECHNOLUX has established over 37-years of unparalleled expertise that represent the backbone of the  foodservice and hospitality industry in the Philippines.

 

The Design Consultancy Division of Technolux is composed of personnel who have the expertise and experience in dealing with various projects for both here and abroad. Technolux has made it a point that the team is supported with both theoretical and practical knowledge to keep them abreast with information necessary to produce effective and innovative results complemented with economical value.

 

The unit has opened its doors to working not only with Technolux but with other equipment providers in the industry. Technolux believes in the strength of many. By working with others, we are able to develop our expertise thus giving us a more holistic approach and advantage. The end result of which is the team’s work value of excellence.

 

Service Overview

Commercial Kitchen

•             Banquet Assembly and Delivery Area

•             Commissary

•             Cook-Chill Kitchen

•             Cooking System

•             Exhibition and Display Kitchen

•             Food Preparing System

•             Food Safety (HACCP & NSF)

•             Global Theme Kitchen

•             Room Service System

•             Sanitation

•             Thematic Buffet Design

 

Laundry / House Keeping

•             Specialized Laundry System

•             Tunnel Washing System

•             Valet Laundry & Dry Cleaning

•             Uniform Storage and Retrieval Systems

•             House Keeping

 

Back of the House

•             Receiving & Storage System

•             Refrigeration Storage System

•             Solid Waste Management

•             Staff Facility

•             Stewarding Area

 

Scope of Work:

Phase 1: Conceptual Schematic Design

Technolux will design a schematic layout based on the parameters set by the project and design team and the hotel operator. The layout will identify the work flow of the assigned floor space. This will enable the respective teams and hotel operator to assess the design and its useability.

 

Phase 2: Design Development

Technolux shall prepare a comprehensive layout, final schedule of equipment, installation and fabrication, based on the approved schematic plans necessary for the approval stage of the client and operators. At this stage, all details of the project such as preliminary Mechanical and Electrical (M&E) load schedule, preliminary budget and time schedule for the design, bidding, evaluation, supply, installation & commissioning and associated equipment & services will be documented for approval.

 

Phase 3: M&E and Rough-In Drawing

Technolux shall consult and coordinate with the architect and Mechanical and Electrical (M&E) consultants for the preparations of all necessary detailed working layout drawings and technical specifications of the facility areas based on the proposal as approved by the client and operators. Technolux will also prepare all technical, legal and commercial documents to be issued to tenders.

 

Phase 4: Tender Process

Technolux will proceed in the development of a comprehensive tender/bid package that will include comprehensive details of all manufactured and fabricated equipment, ratings, schedule, specifications, and other necessary bid documents, short listing of bidders, bid evaluation and recommendation to owners and operators.

 

Phase 5: Contract Management

Technolux shall control and approve all schematic and technical drawings for the submission to the architect and Mechanical and Electrical (M&E) consultants. At this stage, Technolux shall ensure that all details of the project will be met and observed by all participating contractors prior and during installation.

 

Phase 6: Installation, Testing & Commissioning

Technolux shall assist and control the testing of all equipment and submit a final audit report to the client and operators. Technolux will also ensure that the final audit is certified and true ensuring that all warranties are in place, as-built drawings are approved and operator, parts and service manuals are bound into one solid book.

 